AGENDA BILL APPROVAL FORM

 
Agenda Subject:
Capital Projects Status Report and Feature Project (Gaub) (15 Minutes)
Date:
April 20, 2021
Department:
Public Works
Attachments:
Capital Projects Status Report
Staff Presentation
Budget Impact:
Current Budget: $0
Proposed Revision: $0
Revised Budget: $0
Administrative Recommendation:
For discussion only.
Background for Motion:
Background Summary:

The purpose of this discussion is to inform the Council and Public of the overall status of the City’s Capital Project program managed by the Engineering Services Division and to present the 2021 second quarter feature capital project, the 2nd Street SE Preservation project (Project No. CP2003). This Project will reconstruct the pavement on 2nd Street SE between A Street SE and Auburn Way South utilizing Full Depth Reclamation. Full Depth Reclamation is a specialized paving technique that includes pulverizing and blending the pavement into the existing subgrade, adding cement as a stabilizer to the blended material and then paving the top with hot mix asphalt. The project will also replace approximately 450 feet of sanitary sewer main, construct new curb ramps, replace damaged sections of sidewalk and curb and gutter, install new LED street lighting, and upgrade drainage infrastructure as needed. Construction of this project is anticipated to start in June 2021 and be complete in May 2022.

The Capital Project Group of Engineering Services is currently managing 38 projects, valued at approximately $63 million in total project costs.

Reviewed by Council Committees:
Councilmember: Stearns Staff: Gaub
Meeting Date: April 26, 2021 Item Number: